Vidaris, as the building envelope and energy efficiency consultant for the project, worked with the design team and client to rationalize the performance and design intent in the context of an advanced, highly energy efficient and sustainable enclosure system of the Millennium Tower in Boston.
KEY INFORMATION
Project name: Millennium Tower
Date: Completed 2016
Clients: Millennium Partners
Location: Boston, Massachusetts, USA
Size: 1,100,000 square feet
PROJECT SUMMARY
SOCOTEC, as the building envelope and energy efficiency consultant for the project, worked with the design team and client to rationalize the performance and design intent in the context of an advanced, highly energy efficient and sustainable enclosure system, which happens to be a unitized curtain wall system. This included balancing a program for unitized construction that was consistent with an accelerated construction schedule. Our team provided consulting to meet LEED requirements, and with our registered NSTAR vendor status, we guided Millennium Tower through their participation in the NSTAR program. Millennium Tower is also subject to the Massachusetts Stretch Code, which requires energy performance 20% better than ASHRAE 90.1-2007, Appendix G.
PROJECT DETAILS
The 60-story Millennium Tower is built at the old Filene’s site in Downtown Boston and includes residential space as well as space for retail, a sports club, and parking. Its foundation was the largest single concrete pour in the history of Boston. It is LEED Certified.