Hamptons West Condominium in Florida offers luxurious, resort-style living with stunning views and upscale amenities. The property features spacious residences, including multiple bedrooms and modern finishes, complemented by recreational facilities such as a pool, fitness center, and tennis courts. Its prime location provides convenient access to local attractions, dining, and shopping, making it an ideal choice for those seeking a refined and comfortable lifestyle.

 

When the condominium's Association was struggling, SOCOTEC stepped in. 

 

Result: $460,000 in savings & a back on track project. 

    $460K
    Savings & Back-On-Track
image background

Talk to our experts

Michael Pou Principal SOCOTEC | DSS Condo

Michael POU

Principal

Principal

michael.pou@socotec.us +1 305 985 3772
Frank Carino SOCOTEC Project Executive

Frank CARINO

Project Executive

Project Executive

frank.carino@socotec.us +1 305 985 3772

Project Scope & Background

Client: Hamptons West Condominium Association

Location: Aventura, Florida

Services Provided: OPM - Project Planning & Project Controls 

 

The Association struggled for several years to establish a scope of work that was appropriate and financially feasible and to convince the membership that the project was necessary. The Association eventually hired a contractor to perform work on one line of units in order to gauge the extent of needed repairs. Remediating one line of units cost $1 million, took longer than expected, and produced unexpected problems. Based on what they had experienced, the Board decided they needed an appropriate scope of work and a comprehensive plan before any more work was performed. The project scope included Concrete restoration and paint, potential replacement of concrete railings with glass.

Get the project back on track. Clarify the full scope of work, identify inadequacies, inaccuracies, and inconsistencies in the bid documents and the contracts and establish a realistic budget.

SOCOTEC met with the Association’s engineer of record to review the scope of work and identify any gaps and inconsistencies. A correct and fully reviewed scope of work was released for bid to 5 qualified and reputable contractors. The team negotiated with the Association’s preferred bidder on behalf of the Association: comparing contractors' prices to one another, negotiating lower prices on subcontractors and products, negotiating the bond fee, as well as establishing a set purchase price for materials before costs increased due to an expected increase in tariffs.

SOCOTEC was able to get the project back on track and reduce the contract price by $460,000.

Need help with a Renovation Project?